Quick question...
I have a mini itx build and want some advice on how my loop should go. As of right now I have it like this:
Rad->cpu->pump->gpu->rad
I have a 60mm thick 240 rad with a push pull setup.
What do you think? Should I have water hit the cpu first of gpu first?
Thanks!
I have a mini itx build and want some advice on how my loop should go. As of right now I have it like this:
Rad->cpu->pump->gpu->rad
I have a 60mm thick 240 rad with a push pull setup.
What do you think? Should I have water hit the cpu first of gpu first?
Thanks!