Archived from groups: comp.sys.hp.hardware (More info?)
I'm trying to setup (3) new Procurve switches, something like this -
2626(1) ----- 2650 ----- 2626(2)
I'm using (2) new 5' Cat5e patch cables between ports 25 & 26 on the
first 2626 and ports 47 & 48 on the 2650. For the connection between the
2650 and the second 2626 I'm using (4) mini-gbic's with 2pr fiber.
I went into the web interface and setup trunk1 between the first 2626 &
the 2650 and trunk2 between the 2650 and the second 2626. That doesn't
seem to work. I get transmission errors unless I disconnect one port on
each connection, so that I'm only using a single cable/pr fiber.
Portfast is disabled.
Was I incorrect and should all of the connections be part of trunk1, or
am I missing something that I need to configure?
Thanks.
John
I'm trying to setup (3) new Procurve switches, something like this -
2626(1) ----- 2650 ----- 2626(2)
I'm using (2) new 5' Cat5e patch cables between ports 25 & 26 on the
first 2626 and ports 47 & 48 on the 2650. For the connection between the
2650 and the second 2626 I'm using (4) mini-gbic's with 2pr fiber.
I went into the web interface and setup trunk1 between the first 2626 &
the 2650 and trunk2 between the 2650 and the second 2626. That doesn't
seem to work. I get transmission errors unless I disconnect one port on
each connection, so that I'm only using a single cable/pr fiber.
Portfast is disabled.
Was I incorrect and should all of the connections be part of trunk1, or
am I missing something that I need to configure?
Thanks.
John