Hehehehe, i was wondering how long it was going to take before someone asked that :-o BUT i have some bad news about it. I am an OEM and MSI sent me this one as a demo for my net servers that I build. I can't even buy more for around 3 weeks. In 3 weeks they will be released for shipment by MSI USA. I am told once this happens I will be able to get as many as I want SO that means you will have to wait for 3 weeks (and I will too becouse I need 5 more of them). I do have this to say though, I works Really good in my 2U case with 4 18 gig 10k IBM Ultra160 hdd's with a 1.3 Tbird. My rack cases are water cooled along with the ps and hdd's if you where wondering. As a FYI I got the rest of my stuff finally for my home water cooled AMD system (ddr, cracked geforce mx, 156w peltier, swiftech waterblock, etc.) and plan on working on it this weekend. If i get it finished i will post it on a site and link to it from the BBS.
-----------
Chris
ws6@kc.rr.com