Hardware selection for data center Selection

keyur

Distinguished
May 30, 2009
2
0
18,510
Hello Everyone

Basically am Power(Elect. and Mech.) Engineering Student n part time working with one firm(Business Nature Trading of Industrial Goods), which is now going in expansion mod and for that they purchased Oracle base ERP for 200 user license and now we have to procure Hardware for that n its my responsibility to select right product with right price. For that i need ur help could u tell me how many hardware required and which size with application ERP provider already suggest us. Its following

HP ProLiant DL580G5 / (2) 4-Core Intel® Xeon® E7420 Processor (2.13GHz, 8MB L3 cache, 90 Watts) / 4 GB PC2-5300 Fully Buffered DIMMs (DDR2-667) / Two embedded NC373i Multifunction Gigabit Server Adapters / HP Smart Array P400i embedded/256MB Cache / Integrated Lights-Out 2 (iLO 2) Standard Management / 3-3-3 Warranty ------1 No.

Intel® Xeon® E7420 processor (4-core, 2.13GHz, 8MB L3 cache, 90Watts) for DL580 G5----2 Nos.

4 GB FBD PC2-5300 2X2GB Kit----2 Nos.

HP 146GB 3G SAS 10K SFF SP HDD-----05 Nos.

HP DVD+R/RW 8X Slim for DL380G5/580G5----01 No.

HP SA P-Series 512MB BBWC Kit for P400/400i Controller---01

Hot Plug Redundant Power Supply for DL580 G5 800/1200W----02

HP SC11Xe Host Bus Adapter (SCSI)----01

and

Proliant DL360G5 / (1) Quad-Core Intel Xeon E5430 Processor (2.66GHz, 80 Watts, 1333 FSB) / 12MB (2x6MB) Level 2 cache / 2 GB (2 x 1 GB) Standard; PC2-5300 Fully Buffered DIMMs (DDR2-667) / Embedded NC373i Multifunction Gigabit Server Adapters / HP Smart Array P400i/256MB Controller (RAID 0/1/1+0/5) / RFK Std.------02

2 GB FBD PC2-5300 2X1GB Kit ----02 Nos.

HP 146GB 3G SAS 10K SFF SP HDD ----06 Nos.

Slimline DVD-ROM Drive (8x/24x) Option Kit ----02 Nos.

Hotplug Redundant Power Supply 360 G5---02 Nos.

HP SC11Xe Host Bus Adapter (SCSI)----02 Nos.

So guys could u help me out how can i select hardware for my Data center, with IBM and other reputed manufacture, or should i go with Blade server?

Thank you,

Keyur



 

keyur

Distinguished
May 30, 2009
2
0
18,510
Thanx for the reply, i know its good but other side i have one more configuration IBM eServer BladeCenter(tm) Chassis with 2*2000W PSU thus m in confusion which should i select on which basis here i m giving u another configuration.


Suggested Configuration as below

Part No. Description Qty
Blade Chassis- E
86773RA IBM eServer BladeCenter(tm) Chassis with 2x2000W PSU 1
39M4675 IBM BladeCenter 2000W Power Supplies 3 & 4 1
39Y9195 IBM BladeCenter SAS Connectivity Module 2
39Y9324 Server Connectivity Module for IBM BladeCenter 2
39Y8934 Front End PDU 2

Part No. Description – 2 Units of HS21 required Qty
HS21
8853G3A HS21, Xeon Quad Core E5420 80w 2.50GHz/1333Mhz/12MB L2, 2x1GB Chk, O/Bay SAS 2
44T1742 Intel Xeon QC Processor Model E5420 80W 2.5GHz/1333MHz/12MB L2 2
46C7418 2 GB (2x1GB kit) Single Rank PC2-5300 CL5 ECC Low Power 2
39Y9190 SAS Expansion Card (CFFv) for IBM BladeCenter 1

Part No. Description Qty
DS3200
172622X IBM System Storage DS3200 Dual Controller 1
42D0519 IBM 450GB 3.5in HS 15K SAS HDD 6
39R6509 DS3200 SAS 2-Port Daughter Card 1
39Y7927 Line cord - 2.8m, 10A/240V, C13 to IS6538 (India) 1
39R6531 IBM 3m SAS Cable 2

Part No. Description Qty
TS2340
3580S4X TS2340 Tape Drive Express 1
95P4714 5.5M Mini-SAS/Mini-SAS 1x Cable 1
23R6985 2.8M power Cord 1
23R7000 Rack to PDU Line Cord 1
96P1565 Rack Mount Kit 1

Hope u help me out , m not computer genius bt good enough for PC only.