Skip to main content

Stress Test: Power Supplies Under Full Load

Test Methodology

Overview

  • Test Phase 1: Increase load from 20% to 100% of nominal power rating in several steps (appr. 5 hours)
  • Test Phase 2: Steady load at 100% of nominal power rating (appr. 19 hours)
  • Test Phase 3: Measurement of voltages on rails, ripple, noise level, temperatures, efficiency (live broadcast during the test, values at the end of phase 2 are being published)

The Details

Failed Or Passed?

We say that a PSU has failed our test battery if any of the following happen:

  • atis
    Where's the end of article? There are actual test results missing for 7 PSU's.
    Reply