Best SSDs 2026: From blazing-fast M.2 NVMe down to budget SATA

Best SSDs: Reviewed and Benchmarked
(Image credit: Tom's Hardware)

Of the key components in any PC, the storage drive is the slowest, transferring bits in a fraction of the time your CPU and GPU take to process it or your RAM takes to load it. A poor-performing storage drive often leads to a big bottleneck, forcing your processor (even if it's one of the best CPUs for gaming) to waste clock cycles as it waits for data to crunch.

You can fix that problem with an SSD, but finding the best SSD or solid-state drive for your specific system and needs is key if you want the best gaming PC or laptop, or even if you just want a snappy productivity machine. To find the best SSDs for gaming and productivity, we test dozens of drives each year and highlight the best ones here. We also maintain an SSD benchmark hierarchy that ranks SSDs by performance. We have multiple categories, including the best SSD for NAS and the Best SSD for the Steam Deck listed below. For those on the hunt for the best external SSD or the best SSD for the PS5, be sure to head to those links for our recommendations based on our exhaustive testing. If you're looking for the ultimate in cheap and deep storage, we also have a list of the best hard drives.

Prime Day Exceptional SSD deal

Why you can trust Tom's Hardware Our expert reviewers spend hours testing and comparing products and services so you can choose the best for you. Find out more about how we test.

PNY CS2241 1TB M.2 2280 PCIe Gen 4 x4 SSD
Save 15% ($24)
PNY CS2241 1TB M.2 2280 PCIe Gen 4 x4 SSD: was $159.99 now $135.99 at Amazon

If you need a terabyte of solid-state storage on the cheap, this PNY drive offers 5100 MB/s sequential reads and 3200 MB/s sequential writes over a PCIe Gen 4 interface. Get it while it's hot.

Samsung 9100 Pro 1TB SSD
Save 39% ($133)
Samsung 9100 Pro 1TB SSD: was $339.99 now $206.99 at Amazon

This excellent 9100 Pro SSD gives you Gen 5 speeds of up to 14,700MB/s, but is just $10 more than the slower 990 Pro. A perfect drive to boost your rig's speeds as an upgrade, or the start of a new gaming PC.

Samsung 2TB 9100 Pro
Save 41% ($281.47)
Samsung 2TB 9100 Pro: was $679.97 now $398.50 at Amazon

The Samsung 9100 Pro is a high-end PCIe 5.0 SSD featuring Samsung's own Presto controller and 236-layer NAND. The 2 TB model delivers sequential read and write speeds up to 14,700 MB/s and 13,400 MB/s, respectively.

Team Group T-Force G50 Evo (4TB)
Save $110
Team Group T-Force G50 Evo (4TB): was $495.99 now $385.99 at Newegg

Promo code: APC852
This DRAMless PCIe 4.0 SSD is rated to 5,000 MB/s reads and 4,700 MB/s writes, and 1200TBW. It uses 3D QLC NAND, and has a 3-year warranty.

Paul Alcorn
Editor-in-Chief

Paul Alcorn is the Editor-in-Chief for Tom's Hardware US. He also writes news and reviews on CPUs, storage, and enterprise hardware.

With contributions from
  • abryant
    Archived comments are found here: http://www.tomshardware.com/forum/id-3711120/ssds.html
    Reply
  • LordConrad
    About the MX500... "but the 500GB looks really good at just $139.99"

    You might want to double check prices when cutting and pasting.
    Reply
  • Peter Martin
    i can get an mx500 500GB for 90 bucks on amazon, they are fantastic ssd, the larger the better, get all that you can afford
    Reply
  • dannyboy3210
    SX8200 480GB looks unbelievably expensive in the states. It goes for $150 CAD up here: https://www.canadacomputers.com/product_info.php?cPath=179_1229_1296&item_id=123218
    Reply
  • Peter Martin
    I can get that drive for 124 at Amazon
    Reply
  • WildCard999
    I would think the Samsung 860 EVO 500gb would have grabbed the spot for best SATA as you can get it for $99 (500gb) and it's quite fast. I doubt the pro is fast enough to justify the cost over the EVO version.

    http://ssd.userbenchmark.com/Compare/Samsung-860-Evo-1TB-vs-Samsung-860-Pro-1TB/m423831vsm434505
    Reply
  • Jsimenhoff
    Thanks for bringing this to our attention. It looks like the wires got crossed on our pricing widget. We're implementing a fix. Stand by.
    Reply
  • rapidwolve
    Dannyboy3210 Actually that SX8200 is now only $130CDN @ Canada Computers
    https://www.canadacomputers.com/product_info.php?cPath=179_1229_1296&item_id=123218
    Reply
  • Onus
    I recently ordered a 1TB 2.5" WD Blue SSD for ~$139 on a Shellshocker. Hopefully it arrives soon!
    Reply
  • WildCard999
    21394321 said:
    I recently ordered a 1TB 2.5" WD Blue SSD for ~$139 on a Shellshocker. Hopefully it arrives soon!

    Was that the M.2 or the SATA version?
    Reply