Homegrown Mod Manifesto: How To Build A UV PC

Assembling The Final Product, Continued

Installing and cabling the lights comes next. We opt to take advantage of the channel in the front of the cable to run our cables. We then use a hot glue gun to tack the cables down after we determine our cabling path.

A look at the 12" UV light that we have installed in the bottom of the case.

From this angle you can see how we are going to take advantage of the channel in the front of the case to run our cabling for the UV lights. Notice the open 5-¼ bay that is our target. This is where the drive bezel with the switch will be installed and the inverter will rest at the bottom of the 5-¼-drive bay.